S_ALR_87013545 Project Actual Costs show incorrect figure

$
0
0

Hi,

 

I have scenario where the posted figure for work centre does not match the activity type figure(KP26) for example

 

In S_ALR_87013545 report there is a posted figure of £1680 to a network when I drill-down into the figure I can see the network confirmation with 7 hours booked using activity ADMIN from the work centre I can see the cost centre of ADMIN.

 

Using KP26 I can see the rate of £40. Therefore I would have a posting of £280 (7*40) not £1680, does anyone know why I would have this posting? I have checked KP26 on the change log and there have not been any recent changes to the rates.

 

I would add that the incorrect figures are only for 1 employee, others link to the same work centre and activity type and they are posting correctly - ie the correct rate of £40 is used.

 

thanks

 

Joe