Dear Experts,

 

I have a problem in the settlement of a project to cost center which I already asked in the SAP financials-Controlling. However I ask it here for any possible guidance from the experts on the PS module.

I want to settle the activities to WBS and then the WBS to a cost center. I have done the configurations as:

 

Rule for network:

1- Define Strategies for Determining Settlement Rules: 02 (to WBS element)

2- Assign Strategies and Default Rules to Network Types: type=PS02, DfR=PS1, strat=02 (to WBS element)

3- Specify Default Settlement Profiles for Networks: sett.prof.=60 (network)

 

Rule for WBS:

4- Determine Strategy for Settlement Rule: AA element, sett.prof.=60 (network), AcctAssCat=3 (responsible cost center)

5- Assign Strategy to Project Profile

 

Settlement:

6- create settlement profile (in the attached screen)

 

then I define the rules and strategies in the project profile and network settings and also define the responsible cost center for WBS elements. I generate the Rules by running CJB2 and the settlement rules are generated for all activities and WBSs without any problem.

 

However, when I run CJ88 the settlement is not executed and the result in the CJ88 is "no change".

 

I dont know what is the problem here. what is missed or what is any wrong setting?

 

Please help me on this issue. Any help will be appreciated.

 

Thanks in advance