Greetings,
I am receiving inconsistent results when running CJI3 using a Posting Date range. For example, when I run for range of 8/01/2010 - 8/31/2010, only one record shows up (with posting date 8/24/2010). When I leave the "From" date blank and keep the "To" date as 8/31/2010, I see records which were missing from the first run (records with Posting Date of 8/10/10 or 8/11/10, for example). When I run for the short range of 8/10/10 - 8/11/10, there is no result. Leaving either the "From" or "To" dates blank seems to produce the correct result but once both dates are entered many records which should be included do not appear in the results.
In addition, leaving the Project field blank produces no result even though there are several projects with applicable data in the system.
Below is the latest support pack applied in our system:
SAP_APPL 600 0013 SAPKH60013 Logistics and Accounting
Any suggestions on what might be causing this inconsistency will be greatly appreciated.