Hello All,
We are working in non valuated project stock scenario . Material is assigned to the activity , MRP runs and finally production is created for FG. Now, problem is at production level cost analysis i can see all operations and but only those material which have individual/collective indicator as 2( plant stock). Due to this i am not able have correct cost analysis since individual stock related materials are not appearing in production order. I know this is a standard sap process for non valuated project stock case . But still if i want to have correct cost analysis how can i achieve this.
Thanks in advance.