Hi PS Experts,
Kindly give solution for following below problem,
When I run CNE1 and then CNSE5 I check that my POC values
are correct, but still, BCWS and BCWP are not calculated
and maintain the value 0.
I’ve created Value category in OPI1 and assigned it to a
secondary cost element (category 61) in OPI2. Then I’ve
assigned cost element to a cost element group.
At the end, I run CNE1 and CNSE5 and BCWS and BCWP
remain with value 0.
How can I fix this?
Thanks & Regards
srikanth ajja.