Hi Experts,
I am having issue to get total planned production order values in my CN41N or S_ALR_87013533 cost report. I am facing 2 issues :
1. CN41N repoet does not show individual material cost planned in BOM.
2. CN41N report and S_ALR87013533 report does not show total value but only picking fixed value.
Example :
1. CN41N report :
Above screenshot shows no values in Project plan cost & Order cost column but it shows total cost as a lumpsum on top for project. I need to know how can i get material cost populated here for Project Valuated stock material?
2. S_ALR_87013533
This report shows Total Cost of BOM as 1 line under Material Procurement activity similar to CN41N report. Also Order value is picking from Fixed cost from planned order and total cost is added on top. How can i get Total cost picked from production order?
Is there any Setting in PS config which allow me to pick the detail production order plan cost in both report under planned cost.
Thanks in advance.
Ashish