Distributable Budget report

$
0
0

Hi,

 

 

When we assign budget in IM32, lower level WBS budget will be total up to Top Level WBS, which can see in Distributed.

 

My question is If we add budget at Top level WBS at certain intervals, that total budget added will be available in DISTRIBUTABLE.

 

Is there any Distributable report which can help me how much is added at each interval and distribution of that budget.

 

Please help me with Tables / Report which can give us the detailed information.

 

Regards

Naveen