Hi,
We have a scenario here wherein project systems allows entry of incorrect material code during PR creation. These are the steps done:
1. We have a contract with let's say material code X100.
2. User creates a PR in CJ20N referencing the contract with material code X200. Notice that the material code used here is different.
3. Save. No error from the system.
When I tried to replicate this scenario in MM using ME51N (for PR creation reference to a contract) it doesn't allow. How come CJ20N allows these incorrect entries?