BOM PS transfer
Hello PS Gurus, Need some direction in PS in relevant to production of finished material in PS and which option is the best consume the compoI have header material 1000 which has structure like this....
View ArticleKKAJ - Filter doesn't work fine
Hi experts,I run the t-code KKAJ in background with variant.The variant excludes one Company, two Business area and some WBS elements, but at the end of the elaboration it seems that the variant...
View Articlehow to increase the overall budget of a WBS element?
Hi Gurus, While posting an invoice, I got the error msg "item... of WBS elementXXXX...exceeding budget". I went to CJ30 to increase the budget. There I can increase the budget of the WBS element for...
View ArticleExport results from Settlement Rule report (KOSRLIST)
I am running Settlement Rule report transactions KOSRLIST / KOSRLIST_PR .I want to export the results of this report to a spreadsheet, but when I go to the Menu Bar > List > Export >...
View ArticleNot able to supplement budget thorough IM52
Hello All, We are having one issue where our user is not able to supplement WBS element with additional Budget of 973,188.00 through IM52. User gets an error message as " Annual Budget 2012 less than...
View ArticleCN60: Not fetching milestones updated via BAPI_PROJECT_MAINTAIN
Hi All, Currently I am facing an issue related to this post, I have done some custom programming where I am updating the milestones by "BAPI_PROJECT_MAINTAIN" but its not reflecting in CN60, although...
View ArticleChanges not indicated in CN60 for Milestone in WBS Element(CJ20N)
Hi All, When a change of the milestones is made in custom program, the POC (date and percentage) is not indicated in CN60 transaction. However when we change manually the POC (in CJ20N) in SAP, it...
View ArticleUnable to close a project created in distributed system - BS002
I am getting below error while trying to close a project in distribued system "Complete" is not allowed (PRJ XXXXXX)Message no. BS002DiagnosisThe transaction 'Complete' is not allowed for PRJ XXXXXX,...
View Articlerestriction of negative budget in project system
Dear All,while carrying budgeting ,during creation of PO ,PO value is checked and is not allowed to Exceed against the available budget.But in PO we are maintaining tolerance of 10% hence when carrying...
View Articlepercentage of compeltion(degree of processing at wbs level ) in EHP7,SAP HANA...
to carry out the progress analysis, only for carrying out the processing percentage of completion(degree of processing)steps which i followedCreated the progress version and assigned it to the...
View ArticleME5J report Issue.
Hi Folks, I am facing issue with ME5J report. I have created PR from ECP which i can see in ME5J report earlier.But in not able to see the new PR created on same project now. Can i know what may be...
View ArticlePO is closed but still shows in ME2J report
Hi Experts, We have closed the PO but it still shows in ME2J report, can you please suggest a solution for this. Thanks for your help.
View Articlehow to display differ currency in CN41n report
Hello Expert, how to display differ currency in cn41n structure report let say EUR have report and controlling are currency as well but want to display INR in same report instead of EUR.i can see this...
View ArticleUS ABERG may not edit this task (Meassge no.5W308)
Hi, I please need help on the following urgently An appropriation request is created in a PRD system.The persons involved are completed on the AR.When trying to submit the AR for Approval the following...
View ArticleInconsistency in OP45/TCA01
Out of the box release 730. Work center usage 003 'only networks' has task list type 1 assigned in transaction OP45. However, no such entry exists in table TCA01. Is there supposed to be the task list...
View ArticleProject Systems with SAP All-In-One
I know and understand that we can only use Project Systems module in SAP R/3 or SAP ECC which is a high end solution. I would like to know if we can use Project Systems with SAP All-In-One Rapid...
View ArticleUndo WBS System Status Closed
Hi, I am getting a error while undo the system status from CLSD back to REL. Please help me to understand and fix. Error msg screen is attached. Thanks.
View ArticleCNS41 currency want to change INR instead of EUR
Hello Expert,i have controlling area currency EUR but client is required to display report in project currency INR.I have done the changes in RPC0 target currency is INR exchange rate current with ex...
View ArticleProblems with WBS elements Short Text, Translations
Hi,when i create a new project, the shorttext in wbs element level 1 should have the same Short description as the project definition.The WBS elements have traslations in DE and EN. Both should be in...
View ArticleDistribute POCS line items per Line IDs in RA
Dear All, We have two Revenue Line IDs and which is customized in OKG8 to post to different Deferred Income accounts. We have done coding according to Note 26002 as specified in Note 38070 with...
View Article