Dear Experts,
I enter the material for a certain qty in the Requirement Qty fields in the WBS element in CJ20N and save the entries.
Now I change the quantity either increase it or decrease it.
I wanted to know where I can track those changes, I mean is there some table.
I have seen in RESB (Table for reservation) but the updated qty after the changes done is in the same line item in the table. i.e. No separate line items are created in the table for each change in the requirement qty.
In CN60 also the user fields change is shown.
Project profile has changes recording on.
Thanks and Regards,
Yagnesh.