Results analysis / POC method / down payment.

Dear Experts, I am configuring POC method of results analysis in which I need to used down payment received in POC RA results. As per the OSS 448150 I have done following configuration. In Customizing...

View Article


WBS master data transfer from one client to another

Is their is any way to Migrate data from one client to another client in SAP.I have created the complete WBS structure in Development and now i want to copy the same structure to quality Regards

View Article


Image may be NSFW.
Clik here to view.

Easy Cost Planning models

Hi everyone, I have used Easy Cost Planning before, but with basic models, only for materials cost planning or personnel costs using cost center and activity type for price planning.  Now I am facing a...

View Article

Budget Translation Customizing

Hi Experts,Share your thoughts & comments on budget translation.Budget is maintained on Project for over all in AUD. When actual cost is captured for current year through a PO with AUD as...

View Article

how to attach cost elements to the wbs elements

Hi gurus,  I have created project with wbs elements. my client is asking below requirement and they want's to use GL's for all projects.whenever they are posting fi transactions they provide GL only...

View Article


POC not getting aggregated

Hi all,  I have one problem . We are using progress analysis. We are here using milestone method for plan POC for the WBS element/ I habve assigned the milestone method as measurement method for Plan...

View Article

COGS Prov. calculation in PS case

Hi All, We require clarifications on COGS provisions calculated at Period closing and which are posted to CO-PA. Business processes:- Customer projects are created in SAP PS. All materials are attached...

View Article

App Reqst Release

Hello,We have requirement whereby need that AR should not be released till measure has "budgeted"status assigned to it.(ie till Measure is not budgeted).Reason is that once AR is released it is not...

View Article


Variance in Actual cost data among DP99A Extract and CJI3 Extract

Hi,I am trying to compare Actual cost values from CJI3 Extract with DP99A extract, i see all the unbilled values are being missed in DP99A EXTRACT  would request experts response at the earliest...

View Article


Image may be NSFW.
Clik here to view.

How to amend activity dates in a network?

Hiya, I'd like to amend the dates that already exist in a network activity i.e. The 'Act' dates for 'Start' and 'Fin':I've tried using FM BAPI_NETWORK_CONF_ADD and passed my new dates into that FM, and...

View Article

Missing accounting document in CJ8G

Dear experts    I have run project settlement by CJ8G and found that accounting documents were not created. Then I check table AUAK and found settlement document head. But when checking BSEG and COEP,...

View Article

Is it Possible to Create Multiple Reservations Under a Network Activity?

Dear All, Is it possible to Create Multiple Reservations Under a Network Activity?In CJ20N when I am creating the reservations, by default all the material reservations are stored in the same...

View Article

MRP of Q type stock of WBS element no Network

HiI want to run a MRP run of project stock material which is assigned to wbs element only.Means it procured through wbs as account assignment and kept as project stockWe don’t have netwrok, activity...

View Article


SAP PS report-(Open projects snapshot)

Hi Experts,Would there be any Std report available where I can pull the following data in one shot.I am thinking of BW report if it can't be achieved by Std reports.Requirement: The requirement is to...

View Article

Change History

Dear Experts, I enter the material for a certain qty in the Requirement Qty fields in the WBS element in CJ20N and save the entries. Now I change the quantity either increase it or decrease it. I...

View Article


OPEX WBS Structures

Good day all, My company current uses CAPEX IM structures with WBS's as follows: Capex IM Level 1IM Level 2IM Level 3 IM Level 4IM Level 5WBS We want to introduce OPEX WBS's to effectively control and...

View Article

Network settlement issue

Dear Experts, While trying to do the settlement of the Network using transaction code - CJ88, System is giving the message " Either the sender is already settled or there is nothing to settle". I have...

View Article


Planned Network Activity Labor Cost question

Planned Labor Costs question To plan labor costs we do the following but it is cumbersome and time consuming is there another more efficient way of handling this process?We create a project structure...

View Article

Image may be NSFW.
Clik here to view.

Currency Conversion in PS Reporting

HI Gurus, we have an issue using STD reports in Projects system.The problem appears if a transaction is not in a Controlling Area Currency (in our case USD), but in Local Currency - for example EUR.If...

View Article

how to link GL account to wbs element

Hi gurus, i want link the particular gl accounts for particular wbs element, where we can do this configuration. please suggest.......  siddu.

View Article