Hi All,
We need to close the project so need to run CJ88 but before that when we ran KKA2 plan cost is not equal to actual cost in KKA2(As this is the query raised by our client). We tried to reduce the plan costs in Easy Cost Planning(CJ40) and was able to reduce the Planned Cost up to a certain extent. But we were unable to reduce it further i.e the planned cost is still greater than the actual cost..
How can we reduce the Planned Cost so that it equals the actual cost in KKA2 before settlement??
Thanks and Regards,
Avik