Quantity-based budgeting for Construction Industry Solution.
Dear All, In a Construction Industry, quantity-based budgeting, a key requirement. I will be having similar kind of requirement with my present client in SAP PS Module. Let me know if any one have map...
View ArticleGetting message "Availbility Control" BP622 while doing credit memo against a PO
Hi, For a PO, which is assigned to a WBS element, while doing Credit Memo, user gets the error, "Availability COntrol" message number is BP622 . Please let me know, why this message appears and how to...
View ArticleOperative indicators disappearing
HI gurus, when i am create project in Tcode CJ20N operative indicators not appearing. please suggest.......
View ArticleVariants for CNE5
Hellow,I'm trying to figure out what is the different between "Cost Index (corr.)" and "Cost Index (Org.)". to be more specific, I don't understand the different between (corr.) & (org.) Thanks in...
View ArticleHow to perform GR from project system?
Hi, everyone: I know we can use tcode: CNS0 to create delivery note from PS. But what should we do before this? (How to procure the material from PS which deliveried to customer. I know how to make...
View ArticleSales Pricing Issue with multiple currencies maintained on project
Hi,Performing Engineering to order Scenario on IDES. - Creating quotation with multiple currencies maintained in project structureCreated project structure vide standard project Refer screen shotWBS -...
View ArticlePS Certification test
Hi everyone, Actually I´m studying to get certified in module SAP-PS, actually I´m studying the manuals PLM 210, 220 and 230, but I wish practice with a test, Can you give me a test of this module...
View ArticleHow I can notify hours of equipment in CAT´S
Hi Fellows, I need to know how I can notify hours of equipment in CAT´S, actually I know how to notify hours of woerkforce in CATS trough transaction CAT2, but I can´t change the criteria of entry in...
View ArticleI'm new to SAP PS and i want to create blueprint document what should I do ?
any example of blueprints or steps to follow
View ArticleMail triggering through Milestone (Activity assigned) in SOST transaction
Hi,Can anybody give suggestion on mail triggering through milestone (Activity assigned) in SOST transaction.Like for below mentioned points. 1) What is the user exit used in network activity? so that...
View ArticleProblem in 101 Q movement type for Production Order
Hi Frineds, We are having a scenario where in Normal Make to stock Production order, the GR qty by 101 mvt type to be posted as zero value even thoughthe Material is having standard price on that in...
View Articlecommitment still exist even the PO already actual
Hi SAP Gurus I have a problem about Commitment Item on CJI5,when i open CJI5 there are still commitment item on WBS even PO already actual. the PO already fully delivered and invoiced on MIRO i have...
View ArticleProject Profile Results Analysis
Hi All, I have a existing project profile "STAR" which currently does not have RA setup(OPSA - RA key blank) and I have another profile that does have RA setup "TAPE" now I want to copy the RA and...
View ArticleHow to upload Access Control List (ACL) for Projects?
Hi Experts, We are using ACL for Projects. The projects from legacy system (MS Excel) are being migrated and we are building a BDC for this migration. We can see the ACL Tab appearing in recording for...
View ArticleBAPI to upload ACL for WBS
Hi Gurus, Please let me know if there is any BAPI to Upload ACL list to WBS, as i am unsuccessful with LSMW or BDC. Please provide me your valuable inputs. RegardsNaveen
View Articleuser fields groups creation
Hi Gurus, i have attached document in that document where we can do configuration user fields, groups and how to assign division....please suggest.
View ArticleRRB billing with DP96
When we run the billing process sometime it picks up non-material amounts of very low value. The idea is to set up a limit that can be invoiced to Customer, otherwise not to bill it out and keep on...
View Articleerror message CJ067 and oss-note 124177
Hello, We are in a business where projects require cross company collaboration and it was our requirement to make this possible without having to create additional WBS-elements. Earlier this year, we...
View ArticleHow to reduce plan cost to actual cost in KKA2 (RA)
Hi All, We need to close the project so need to run CJ88 but before that when we ran KKA2 plan cost is not equal to actual cost in KKA2(As this is the query raised by our client). We tried to reduce...
View ArticleConfiguraion profile
Dear All, When I am assigning a material in a network, I need to give the batch number in the assign Batch number in the general data tab. But while assigning a batch number i get the error "There...
View Article