The scenario is that the organization wants to implement assembly processing with networks for their MTO variant configured scenario.
The super BOM is maintained as a group BOM i.e. without any assignment to a plant. The plants are determined through special procurement key on the material master.
Also the super BOM has multiple variant levels, phantom assemblies and class items. Will this kind of master data set up work with PS configured networks?
When we assign the group BOM to a standard network, the system requires us to enter a plant. This doesn't transfer all the components.
Any advice on this will be of great help.