Person Responsible and Applicant Number Configuration In CJ20N (Project...
Hello Guru, Please I need a direction.My client is asking to maintain responsible person and Applicant number in CJ20N (Project builder) per the screen below. 1. For person responsible, I went to...
View ArticleProject based Material Reservations with Budget Availability Control
Hi Experts, I went through various blogs on the same subject but unfortunately neither of them were answered. We have a business requirement to apply availability control as soon as we create material...
View ArticleBAPI_COSTACTPLN_POSTPRIMCOST_Number Range for Act RKP5 Error
Hi Experts, We are trying to create a program to update CJR2 with revenue plan for a WBS and cost element for specific periods. (don't what to use excel integration standard solution)So we are using...
View ArticleOpenPS for Windows 8 and Microsoft Project 10
Hi experts ! As per SAP Support Portal, to use OpenPS we need the following software units: Microsoft Windows® 2000 or 2003, Windows® XP or Windows Vista (32 bit)Microsoft Project 2000, 2003 and 2007...
View ArticleOpenPS_for_MS_Project_4.0
Dear PS Experts,I have installed OpenPS_for_MS_Project_4.0 in my system which is having MSP 2013 version & windows8.I have understood that the system requirement is MSP2007 & Windows...
View ArticleWBS- Full settlement not happening to Final asset ?
Hi Friends, The WBS element was settled to AUC(automatically created one) periodically for few months in the last year. Now, client would like to do the FULL settlement of WBS to Final asset(not to...
View ArticleInterest is not calculating correctly in Project System
Hello Gurus, We have implemented functionality to capitalized interest on Asset through Project system. We are calculating interest as per line item basis. System is not calculating interest correctly...
View ArticleDifferent currency in cost planning
Hi All, In same project structure we are using different currency for each wbs (for Ex under project we had created 4 level of WBS ) my question is can we able to plan cost with their updated in WBS...
View Articleproject profile configuration
Dears, I am now working in a construction project, every project have more than 100 WBS element.i am now configuring the project profile and i want to know how can i decide to make :network...
View ArticleProject Scheduling issue in the project planning board
Dear PS experts, I have an issue while making project scheduling i have a project as below: WBS 1 ---------------Act 1 ------- ACT 2--------...
View ArticleSAP PS Settlement to AUC with WBS assigned
Hi, We have a Project settlement to AUC. On the GL account for the AUC I want the account assignment to be populated with the WBS element so that the line items are reported in CJI3. Please advise...
View ArticleMaterial determination issue in DIP profile
Hello, I had configured the DIP profile to get the 'Material costs' and 'Labor costs'. I was able to see the Labor costs in DP91. However, the Material costs are not flowing over in DP91. Can someone...
View ArticleCan we use a variant configured group BOM with SAP PS (configurable network -...
The scenario is that the organization wants to implement assembly processing with networks for their MTO variant configured scenario. The super BOM is maintained as a group BOM i.e. without any...
View ArticleGenerate PR from stock item in network activity - PS
Dear Experts, I have two points in PS:I want to generate PR from stock material on PS activity.I want only PR but system will generate reservation as well when assigning stock item. I have configured...
View ArticleMilestone Actual Dates
Dear Experts, Please note that actual dates are not copied automatically to milestone even though I maintained the confirmation parameters. Any idea what could be the reason? ThanksAbdul
View ArticleActual posting by activity Type
Hi Experts !Please help me clear my understanding and configure the following scenario. I want to plan and post the cost in network activity by using Activity Type. I have one activity say -...
View ArticleCalculation of RA Key - Revenue Based with Profit Realization
Hi All, There is a new RA Key which has been configured based on 'Revenue-Based Method - With Profit Realization'. Attached screenshot for the settings: Please advise: 1. What will be calculation...
View ArticleR&D Project
Hi experts, Please guide me how to create R&D project and its execution in short. Thanks
View ArticleStandard Network Issue
Hi All, I have an issue while working with Standard Network Creation. In CN01 transaction, when I start creating a Standard Network( by copy metheod), the mandatory input first is Network Profile. It...
View ArticleSKF Tab Not Coming at Activity Level
Hi Everyone, Please suggest on below two issues on the earliest. 1. My client requires Progress analysis at Activity level, but SKF tab not coming at activity level, I found SAP note 1733126, 19015666,...
View Article