Hello Gurus
I am currently working on manually setting up a functional PS module without activating the standard best practices for an industry. At the moment, I am faced with a material assignment problem, which I would like the house to help out with.
Please find screen shots with descriptions.
1. I have built a simple Project Plan with a material assigned (Cost 1,000,000) and an internal activity with rate 29,865 Per Hour for 1 Hour. My expected total project planned cost should be 1,029,865. The problem with the material aspect is that it does not show up under project planned cost in my report but instead it shows up under Project Planned revenue.
Kindly help me identify whats missing in my configuration.
- I have highlighted the project Plan with material assigned
- See Screen shots for different material tabs
- Assigned my Internal Activity which has a rate define in KP26
- Save my project and ran the overview report CN41
Please note that I do not have this issue on a different system that has the standard building blocks already activated. I have compared both systems trying to find the missing setting without success yet.