Hi Guru's,
As per my business scenario, i am creating project with WBSE, Activities and BOM.
By using the reference points, i am transferring the BOM to Project, then executing MRP run.
But after MRP run i found that multiple PR's generated for the same Material.
Please find my BOM structure
BOM-->Assembly + raw material
Assembly is consists of
Sub-Assembly+ 2 raw materials
Sub-Assembly consists of
1 Raw Material.
as per this i should have 4 PR's after MRP but system is generating 8 PR's.
Please tell me where i am doing wrong
Regards,
Bhadra