SAP PS-Activity cancellation issue

$
0
0

Hi every one,

 

I have issues with activity confirmation report.

Issue1:  I have confirmed activity 2 to 3 times, system is allowing to confirm more than 100%. I have used workcenter with processing % as 100%.

Issue2:  After cancellation of activity, system is showing wrong values in actual processing % values and report is showing wrong.

I have not used any capacity requirements.

I request to tell me the reason and how to correct the issues.

 

Warm regards,

Jyothshna