All WBS elements should be flagged as Billing Elements
Hi everybody, My client wants to have all WBS elements of projects sholuld be falgged as"Billing Element" irrespective of status( fewprojects are in "created" and few are in "REL" andremaining are in...
View ArticleNetwork and activity names in English
Hi AllI want to know how the names of activites and network's shouldbe displayed in English. I have created the operative projectby the copy the standard project. This is in IDES system andI have made...
View ArticleCJ2B - Change of fields for filtering
Hi, I have got a request to add fields for filtering once you are in the planning board (TC CJ2B). I haven't found out if this is possible. Does anyone have any idea if this would be possible. We are...
View ArticleSD billing plan dates not updated with Milestone billing dates(if the dates...
Gurus! I am finding it strange. i am using milestone billing and a billing plane is ready in SD module. Now, if i change the Milestone planned billing dates in PS module, the dates are not getting...
View ArticleError during copy of partner: Partner role SP Message no. VL864
while we are doing delivery in consignment issue process i am getting "Error during copy of partner: Partner role SP" message no.VL864i was tried previous posts in scn with this message no but i didn't...
View ArticlePlan value is not reflecting in Cj30(overall )
Hello , I am doing ECP for the project and I get the Plan cost which I am able to see in Cj20n- ECP version 0. We have overall budget concept in cj30. Now I need to transfer the Plan to Budget cost ,...
View ArticleCost element 411075003 not allowed for activity %000000000003 0010
Hello Guys, In the Process of creating project (WBS/PEP) using CJ20N, the cost activity has to be include in the project. then I try to save the project the give the error message is "cost element...
View ArticleCN60 not showing change to dates in wbs Element
Hi Team, Need your support in below issue. I want to use "Change Documents" log feature for below fiels in Project System WBS Element. BscStart (WBS element: Basic start date (PRTE-PSTRT))Bsc Fin...
View ArticleIssue when i try to use IMMCP3.
I have changed the existing values of a WBS in CJ40 & made one of the WBS value to ZERO. But when i try to use IMCCP3 the value of ZERO WBS is not getting copied to the Budget but instead it is...
View ArticleDynamically set PRPS-USRxx fields to be optional or mandatory
Hello We use some user fields in WBS elements. However, depending on field content we have in PRPS-POSKI, PRPS-PLAKZ, PRPS-BELKZ and PRPS-FAKKZ we would like to dynamically set some specific fields to...
View ArticleTotal up of Actual cost to Upper level
Hi All , I have WBS structure with 4 to 5 level . Now I want sum of Actual cost from forth level to first level of GR value + Goods Issue value (from table QBWE -SALK3 & MSEG-BWART(281 ) &...
View ArticleCan't post Down payment error comes wbs element xxx is not a billing element
Dear Expert's i got an issue from Fi team when they try to post down payment request they are getting an error saying wbs element is not a billing element but the process is they are referring PO for...
View ArticleCurrency conversion issue in Program Budget Supplement
Hello All, In IM30 screen we have following currencyObject Currency = CADControlling Area Currency = USD The issue is when I change the currency from object currency(CAD) to controlling area...
View ArticleOriginal Budget - Release Budget = Remaining Balance Amount
Dear Experts, As per the below example, Where can I see Remaining Balance and Original Budget+Remaining Balance Values? How the system will calculate > and < values, because my original values...
View ArticleProgress of Investment Management Project
Hello All, I had created a investment project. I had assign IM profile in to project profile. AUC created when WBS release. During settlement cost settle to AUC and then to fixed asset. I want to...
View ArticleResult Analsysis
We have unique situation for Result analysis on WBS processed during RA. Last posting was done on a particular WBS during FY 2008. every day we execute full RA but suddenly this WBS got picked up in...
View ArticleMass change of WBS status
Dear All, I need help on below matter. 1 - I have number of WBS whose status is released and settlement also done, i want to change the status of all those WBS elements to TECHO.2 - After settlement is...
View ArticlePO Creation without WBS budget but AVAC activated
Dear Experts, I have activated budget with AVAC for a project, If budget is available in wbs element i can create PO and post direct cost. But for some wbs elements there is no budget and the user...
View ArticleKOAL and KOAO settlements
Hello everyone, When do settlements take place with transaction type KOAL, as opposed to KOAO? We have a running PS set-up with hybrid projects (WBSEs and networks). Network activities are settled to...
View ArticleHow to assign & release 0 (zero ) budget for project
Hi All , My client requirement is assign Zero budget to project butt in Tcode CJ30 it is not accepting the Zero value . Also they want to Release for same , so I want to know how to assign &...
View Article