Bapi to create project version or create a project version automatically as...

Hi Experts, My client requirement is to create a project version as soon as project status changes to released . Can u please help me with bapi which will work same as CN72.Or any other way so that...

View Article


How to define relation between wbs to wbs in sap ps

Hi Experts, How can i define relationship beetween wbs to wbs as i.e wbs1 should start after wbs2 etc.Same as it works for activity. My current configuration is allowing me to maintain relationship...

View Article


Issue while doing TECO

Hello X'perts, We are a distribution business and facing an issue while trying to TECO a scheme. In our scenario SUB-WBS are individual projects that are worked upon. This particular scheme has been...

View Article

Fetching data from S_ALR_87013558 Report

Hi Experts,We want to execute S_ALR_87013558 report and extract values from this report. We are using SUBMIT statement to call this report. But the input screen using transaction code and Submit...

View Article

Image may be NSFW.
Clik here to view.

CJE0 report painter- Annual Overview 21ERL2

Hi All,  I would like to copy the report painter from CJE0.  Report Code - 21ERL2 and the form as well. Then i managed to add another previous year. However, i could not    CJE1 .   CJE6  I managed to...

View Article


How to copy the data of S_ALR_87013558

Hello Experts, For analysis purpose my client want to take the data of S_ALR_87013558 in local file.But not able to get that data ...even tried to get that data through background run option...but not...

View Article

Negative Costs in cji3 Report

Hi ,We are presently facing an issue with negative costs in cji3 report (Actual Cost Line Item Report). How to get rid of these negative balances? What should be done to ensure that there are actuals...

View Article

Image may be NSFW.
Clik here to view.

Help configuring Automatic Generation of Settlement Rule for WBS

Hello Experts, I an new to the PS module so please bare with me. So we have customer projects, and we only want the higher Level WBS to be settled to COPA, and all lower levels WBSs should settle on...

View Article


CJI5 has 2 line items whereas PR has only 1 line item..

Hi Experts, Here i have an issue where CJI5 has 2 line items whereas PR has only 1 line item..And user deleted the 1 line item in PR and same is showing 0 value in EBAN table too i.e correct.But when i...

View Article


Profit Center From Network

Hi, For one of our report, similar to F.19, we need to retrieve Profit center for the network. From which table profit center can be pulled by passing network number? CAUFVD-PRCTR ....CAUFVD is a...

View Article

Image may be NSFW.
Clik here to view.

CN41N Authorization object Issue - C_PROJ_VNR

Hi Gurus, When my users running the CN41N / CN43N they were unable to view the list of projects, as i was able to view them. as per the SU53 information provided the required authorization  for...

View Article

Image may be NSFW.
Clik here to view.

Easy Cost Planning at Network Level

Hi All, I was able to implement ECP at WBS level, but not able to implement at network level. I am using SAP ECC 6.0 EHP 4.I have activated the business function ops_ps_ci_1 and also activated the...

View Article

BAPI to upload ACL for WBS

Hi Gurus, Please let me know if there is any BAPI  to Upload ACL list to WBS, as i am unsuccessful with LSMW or BDC. Please provide me your valuable inputs.  RegardsNaveen

View Article


Investment Program XXXX/YYYY does not exist

Hii all, I'm trying to link a wbs element to a investment program using project builder.During linking My inputs are : Investment program : 1300Position Id : 1000Approval Year: 2014 But when I continue...

View Article

WBS determines dates

Hello,I configure WBS determines dates to WBS scheduling profile.Activities networks are assigned to a WBS level 3 and the nwtwork header assigned to WBS level 2.Basic dates are maintained on WBS level...

View Article


SAP CATS_DA Run Time Error

Hi Friends, We are facing issue with SAP CATS_DA Report. It is giving ABAP Run Time Error. It is running for long time and than giving run time.             When we run this report for a network...

View Article

Standard Network with Standard WBS not creating the project

Hi, I've got existing Network templates set up for various company codes. The std networks are linked to std wbs elements. This creates a full project structure when coping the standard network in...

View Article


Write authorization of ACL at WBS level

Dear All, We activated ACL (No inheri.) at WBS level.According to my understanding in "write" authorization, we can just change the PS object but we can't delete the object.We assigned "Write"...

View Article

BOM Transfer CN33

Hi gurus. We are using the BOM Transfer CN33 to project activities. There is one issue: the materials are being assign to confirmed activities (status CNF). How could I change it? Best RegardsAlessandro

View Article

Set Project Database profile default for transaction

Hello experts.For our needs we have to set PDB 0000000001 default for just one report CN41N. For all other reports we need other databse profile. That way set user parameter PDB in SU01 is not suitable...